Tunnel Breakthrough At Washwood Heath HS2 High-Speed Railway Construction Site
A worker at the Washwood Heath HS2 High-Speed railway construction site in Birmingham, UK, on Friday, May 9, 2025. Costs attached to the rail project, which was originally designed to link London to Manchester and Leeds, via Birmingham, had risen to as much as £98 billion ($128 billion) by 2020, up from an initial estimate of £37.5 billion for the entire network. Photographer: Darren Staples/Bloomberg via Getty Images

PURCHASE A LICENSE
How can I use this image?
$375.00
USD
Getty ImagesTunnel Breakthrough At Washwood Heath HS2 High-Speed Railway..., News Photo
Tunnel Breakthrough At Washwood Heath HS2 High-Speed Railway... Get premium, high resolution news photos at Getty ImagesProduct #:2213586950

$499$175
Getty Images
In stockDETAILS
Restrictions:
Contact your local office for all commercial or promotional uses.For editorial use only. Additional clearance required for commercial or promotional use, contact your local office for assistance. Any commercial or promotional use of Bloomberg content requires Bloomberg's prior written consent.
Credit:
Editorial #:
2213586950
Collection:
Bloomberg
Date created:
May 09, 2025
Upload date:
License type:
Release info:
Not released. More information
Source:
Bloomberg
Object name:
UK HS2
Max file size:
4491 x 3012 px (14.97 x 10.04 in) - 300 dpi - 3 MB
- Birmingham - England,
- Business,
- Business Finance and Industry,
- Color Image,
- Construction Industry,
- Construction Site,
- Development,
- Economy,
- England,
- Europe,
- Finance and Economy,
- HS2,
- High Speed Train,
- Horizontal,
- Industrial Equipment,
- Industry,
- London - England,
- Moor,
- Occupation,
- Photography,
- Public Transportation,
- Rail Transportation,
- The Media,
- Train - Vehicle,
- Transportation,
- UK,