Boeing Tests The 787 In First Flight Since Being Grounded

Keywords

A LOT Polish Airlines Boeing 787 Dreamliner with a redesigned lithium... News PhotoAirport Runway,Boeing 787,Everett - Washington State,Finance,Flying,Horizontal,Lithium,Politics,Taxi,Transportation,USA,Washington StatePhotographer Collection: Getty Images News 2012 Getty ImagesEVERETT, WA - MARCH 25: A LOT Polish Airlines Boeing 787 Dreamliner with a redesigned lithium ion battery taxis from the flight line to the runway before a test flight March 25, 2012 at Paine Field in EVERETT, WA. The 787 has been grounded since January after problems with the lithium ion battery. (Stephen Brashear/Getty Images)