Boeing Commercial Airplanes CEO Ray Conner News Conference

Mike Sinnett, vice president at Boeing Commercial Airplanes and chief project engineer of the 787 program, right, speaks as Raymond "Ray" Conner, president and chief executive officer of Boeing Commercial Airplanes, center, looks on during a news conference in Tokyo, Japan, on Friday, March 15, 2013. Boeing Co. said the proposed redesign of the 787 Dreamliner's battery systems can be put in aircraft within weeks as the planemaker aims to resume services of the model that has been grounded for two months. Photographer: Koichi Kamoshida/Bloomberg via Getty Images
Mike Sinnett, vice president at Boeing Commercial Airplanes and chief project engineer of the 787 program, right, speaks as Raymond "Ray" Conner, president and chief executive officer of Boeing Commercial Airplanes, center, looks on during a news conference in Tokyo, Japan, on Friday, March 15, 2013. Boeing Co. said the proposed redesign of the 787 Dreamliner's battery systems can be put in aircraft within weeks as the planemaker aims to resume services of the model that has been grounded for two months. Photographer: Koichi Kamoshida/Bloomberg via Getty Images
Boeing Commercial Airplanes CEO Ray Conner News Conference
PURCHASE A LICENSE
How can I use this image?
$499.00
USD

DETAILS

Restrictions:
Contact your local office for all commercial or promotional uses.For editorial use only. Additional clearance required for commercial or promotional use, contact your local office for assistance. Any commercial or promotional use of Bloomberg content requires Bloomberg's prior written consent.
Credit:
Bloomberg / Contributor
Editorial #:
163717712
Collection:
Bloomberg
Date created:
March 15, 2013
Upload date:
License type:
Release info:
Not released. More information
Source:
Bloomberg
Object name:
BOEING BATTERY