TANZANIA-CHINA-CONTRUCTION : News Photo

TANZANIA-CHINA-CONTRUCTION

Credit: 
AFP / Stringer
A Chinese technician with China Railway Major Bridge Engineering Company Limited (MBEC), Li Shaoxun, measures the depth of one of the piers on the construction site of a bridge at Kurasini area in Dar es Salaam on March 23, 2013. The bridge with a total length of 680m will have six dual-way motor lanes and double-sided pavements. AFP PHOTO/ JOHN LUKUWI (Photo credit should read JOHN LUKUWI/AFP/Getty Images)
Caption:
A Chinese technician with China Railway Major Bridge Engineering Company Limited (MBEC), Li Shaoxun, measures the depth of one of the piers on the construction site of a bridge at Kurasini area in Dar es Salaam on March 23, 2013. The bridge with a total length of 680m will have six dual-way motor lanes and double-sided pavements. AFP PHOTO/ JOHN LUKUWI (Photo credit should read JOHN LUKUWI/AFP/Getty Images)
Calculate price
View cart
Date created:
March 23, 2013
Editorial #:
164381991
Restrictions:
Contact your local office for all commercial or promotional uses. Full editorial rights UK, US, Ireland, Italy, Spain, Canada (not Quebec). Restricted editorial rights elsewhere, please call local office.
License type:
Rights-managedRights-managed products are licensed with restrictions on usage, such as limitations on size, placement, duration of use and geographic distribution. You will be asked to submit information concerning your intended use of the product, which will determine the scope of usage rights granted.
Collection:
AFP
Max file size:
4,896 x 3,264 px (68.00 x 45.33 in) - 72 dpi - 6.64 MB
Release info:
Not released.More information
Source:
AFP
Barcode:
AFP
Object name:
Par7512903

Keywords

This image is subject to copyright. Getty Images reserves the right to pursue unauthorized users of this image or clip, and to seek damages for copyright violations. To learn more about copyright and Getty Images’ enforcement program, click here. Availability for this image cannot be guaranteed until time of purchase.
A Chinese technician with China Railway Major Bridge Engineering... News Photo 164381991Architecture,Arts Culture and Entertainment,Chinese,Construction,Dar Es Salaam,Deep,Geographical Locations,Horizontal,Measuring,Pier,Site,Tanzania,TechnicianPhotographer Collection: AFP 2013 AFPA Chinese technician with China Railway Major Bridge Engineering Company Limited (MBEC), Li Shaoxun, measures the depth of one of the piers on the construction site of a bridge at Kurasini area in Dar es Salaam on March 23, 2013. The bridge with a total length of 680m will have six dual-way motor lanes and double-sided pavements. AFP PHOTO/ JOHN LUKUWI (Photo credit should read JOHN LUKUWI/AFP/Getty Images)